Donate using PayPal

All photos in & around Camden

Showing items 1 to 100 from total of 1,424 items. Ordered by photo # descending.

Photo # Icon Photo Caption Categorisation
113336Photo #113336Arrived at Kings Cross this evening to find this, which made my blood boil, all that money spent on a special separated lane for taxi drivers and they don't use it!

#HappyValentinesDay t.co/A8C5DhuOvs

[Click on Nearby Photos to see how busy this area is with taxis for most of the day]
Road environment:
Infrastructure
road
113333Photo #113333Left-turn lane for cyclists to route C27.Cycleway:
Infrastructure
cycleways
113331Photo #113331New two-way cycle-only route and bike-sharing station.Cycleway:
Infrastructure
cycleways
113330Photo #113330Contraflow cycle lane ahead to the British MuseumRoad environment:
Infrastructure
road
113329Photo #113329Flexible bollards, I hope, but still, why bother?Cycleway:
Infrastructure
cycleways
113328Photo #113328Protected straight-on and left-turn cycle lanes under construction.Cycleway:
Infrastructure
cycleways
113327Photo #113327Cycle parking, and roadworks for the creation of a new cycle route to Howland StreetCycle parking:
Infrastructure
cycleparking
113325Photo #113325No Entry Except Cycles - and no need for an island in the road.Road environment:
Good practice
road
113324Photo #113324The food market is clearly more important than Dutch-style ranks of cycle parking. Maybe they're right.Other:
Infrastructure
general
113044Photo #113044St PancrasDestination:
Misc
destinations
113043Photo #113043Up high from Euston RoadRoad environment:
Infrastructure
road
113042Photo #113042Up high from Euston RoadRoad environment:
Infrastructure
road
112580Photo #112580Generally a low-traffic areaRoad environment:
Good practice
road
112579Photo #112579Nice parkDestination:
Infrastructure
destinations
112578Photo #112578StreetRoad environment:
Infrastructure
road
112577Photo #112577Cut-throughRoad environment:
Infrastructure
road
112576Photo #112576London Cycle hire pointBike share:
Good practice
bikeshare
112575Photo #112575StreetRoad environment:
Infrastructure
road
112574Photo #112574Wide streetRoad environment:
Infrastructure
road
112573Photo #112573London Cycle Hire pointBike share:
Good practice
bikeshare
112572Photo #112572Usually pleasant streetRoad environment:
Good practice
road
112512Photo #112512Lots of bike tags about this area being closed off for engineering work.General sign/notice:
Good practice
signs
112375Photo #112375New segregated cycleway under construction on Gower Street, LondonCycleway:
Infrastructure
cycleways
112374Photo #112374Strange semi-Dutch cycleway but with a cycle symbol on the carriageway, which is where most cyclists ride.Cycleway:
Infrastructure
cycleways
112373Photo #112373Counter-intuitive route for cyclists to Central LondonRoute sign:
Infrastructure
routesigns
112372Photo #112372There's a cycleway into this closed-off road but not out - a wasted opportunity.Cycleway:
Problem
cycleways
112371Photo #112371Protected cycle lane at the Highgate Road junction, Kentish Town (and a Co-op delivery bike)Cycleway:
Infrastructure
cycleways
112370Photo #112370Protected cycle lane at the Highgate Road junction, Kentish TownCycleway:
Infrastructure
cycleways
111994Photo #111994Hi @CamdenCouncil is it possible to arrange a meeting with the person that signed off screwing this bollard in the cycle lane. Would really love to talk through the benefit and the thought process to get there. Thanks @camdencyclists @RantyHighwayman @AdamDKHarrison t.co/s5MyLwsgf0Other:
Infrastructure
general
111574Photo #111574A dead end for cars, perhaps, but not for cyclists.General sign/notice:
Problem
signs
111573Photo #111573No Entry Except CyclesCycleway:
Good practice
cycleways
111572Photo #111572Bike shop, FarringdonBike shop:
Infrastructure
bikeshops
111571Photo #111571Lots of cycle parking by the ITN building, LondonCycle parking:
Infrastructure
cycleparking
111570Photo #111570Road closure and parallel crossingsCycleway:
Infrastructure
cycleways
111569Photo #111569Road closure and parallel crossingsCycleway:
Infrastructure
cycleways
111568Photo #111568There's a raised section of road but no other help for people wanting to cross Guilford Street here.Road environment:
Infrastructure
road
111567Photo #111567Cycle parking and barrier parallel to Grays Inn RoadCycleway:
Infrastructure
cycleways
111566Photo #111566Contraflow lane on Argyle StCycleway:
Infrastructure
cycleways
111565Photo #111565Right-hook lane at this crossing to Kings Cross stationCycleway:
Infrastructure
cycleways
111309Photo #111309Please can you put one at Rudall Crescent NW3 1RR? We have none. Thanks.Cycle parking:
Problem
cycleparking
111308Photo #111308Please can you put one at Rudall Crescent NW3 1RR? We have none. Thanks.Cycle parking:
Problem
cycleparking
111264Photo #111264Cycle parking needed here.Cycle parking:
Problem
cycleparking
111263Photo #111263Cycle parking needed here.Cycle parking:
Problem
cycleparking
111045Photo #111045no available cycle parking nearbyCycle parking:
Problem
cycleparking
110666Photo #110666Cycle parking needed here.Cycle parking:
Problem
cycleparking
110055Photo #110055On the island between the carriageways.Cycle parking:
Infrastructure
cycleparking
110054Photo #110054On the island between the carriageways.Cycle parking:
Infrastructure
cycleparking
109695Photo #109695Cycle parking needed here.Cycle parking:
Problem
cycleparking
109503Photo #109503Sheffield stands on this little square - always fullCycle parking:
Infrastructure
cycleparking
109502Photo #109502There is no on-street parking on this or surrounding street - many bikes chained to poles. Parking sign poles need loops fitted, or some Sheffield stands in front of the church, or Bikehangar by removing parking spaceCycle parking:
Problem
cycleparking
109337Photo #109337Cycle route past the Francis Crick InstituteCycleway:
Infrastructure
cycleways
109336Photo #109336Cycle routes past the Francis Crick InstituteRoad environment:
Infrastructure
road
109335Photo #109335Right turn for cyclistsRoad environment:
Infrastructure
road
109334Photo #109334These planters are usually used for cycle parking but here are used to slow/deter cyclistsObstruction:
Infrastructure
obstructions
109333Photo #109333Through route needed for cyclingObstruction:
Problem
obstructions
109332Photo #109332Sudden end of cycleway - this obstruction has been here for so long that it's visible on the satellite imagery.Obstruction:
Problem
obstructions
109331Photo #109331Segregated cycle lane north of St Pancras stationCycleway:
Infrastructure
cycleways
109330Photo #109330Start of off-road cycle lane north from St Pancras stationCycleway:
Infrastructure
cycleways
109329Photo #109329Bus in left-turn lane, which was clearly a cycle lane until new provision was added to the left.Cycleway:
Infrastructure
cycleways
109328Photo #109328New protected cycle lane under St Pancras stationCycleway:
Infrastructure
cycleways
109327Photo #109327Long queue of taxis for the Kings Cross/St Pancras rank - and No Motorised Vehicles sign ('except taxis' plaque missing?)Road environment:
Infrastructure
road
109326Photo #109326New stretch of protected cycle lane, St Pancras stationCycleway:
Infrastructure
cycleways
109325Photo #109325Barriers to slow cyclists on the Regent's CanalCycleway:
Infrastructure
cycleways
109324Photo #109324Cycle parking at the Coal Drops YardCycle parking:
Infrastructure
cycleparking
109323Photo #109323Cyclist in pedestrian area, the Coal Drops YardOther:
Infrastructure
general
109322Photo #109322Cycle parking at the Coal Drops YardCycle parking:
Infrastructure
cycleparking
109321Photo #109321Contraflow cycle lane protected during construction across the roadCycleway:
Good practice
cycleways
109320Photo #109320Bike-sharing station and cycle contraflow laneOther:
Good practice
general
109319Photo #109319Parallel zebra/cycle crossing from Kings Cross/St Pancras to the University of the ArtsCycleway:
Good practice
cycleways
109318Photo #109318Shared use from Kings Cross/St Pancras to the University of the ArtsCycleway:
Infrastructure
cycleways
109234Photo #109234Please put back the two stands that were here until recently (removed as part of pavement refurbishment?). Needed for local offices etcCycle parking:
Problem
cycleparking
108663Photo #108663Quite a quiet road (for Central London)Cycle parking:
Infrastructure
cycleparking
108649Photo #108649Disabled tricycle - I have brought a disabled tricycle but it’s very wide and very different for me to take inside my home flat a 4 Parliment hill NW3 2sy. It is also plain full as I have 7 steps to the front door. Please can I leave it outside on the road? I have a blue badge and receive PIP registered disabled.Cycle parking:
Problem
cycleparking
108270Photo #108270Cycle parking present here.Cycle parking:
Infrastructure
cycleparking
107527Photo #107527Not just Congestion Charging, but the ULEZ is here too!General sign/notice:
Infrastructure
signs
107526Photo #107526Cycle parking at the (increasingly popular) Wellcome CollectionCycle parking:
Infrastructure
cycleparking
107525Photo #107525Route signs and No Entry Except Cyclists towards the Euston RoadRoute sign:
Infrastructure
routesigns
107524Photo #107524New cycle-only layout of Judd Street at the British Library crossroadsCycleway:
Good practice
cycleways
107523Photo #107523New cycle-only layout of Judd Street at the British Library crossroads. Also cycle parking - two Sheffield stands to the left.Cycleway:
Good practice
cycleways
107522Photo #107522New right-hook arrangement at the British Library crossroadsRoad environment:
Good practice
road
107521Photo #107521Sign for new right-hook arrangement at the British Library crossroadsGeneral sign/notice:
Good practice
signs
107307Photo #107307There is a desperate need to have covered cycle parking. I suggest using Cyclehoop bikehangars for this location as it is ideally placed and space availble on the footpath as it is overly large in this location.Cycle parking:
Problem
cycleparking
107079Photo #107079Cycle parking at the Waitrose, Brunswick Centre - a long way from any road or cycleway.Cycle parking:
Infrastructure
cycleparking
107078Photo #107078Cut-through beside the Francis Crick Institute to St Pancras stationCycleway:
Infrastructure
cycleways
106777Photo #106777Cycle parking present here.Cycle parking:
Infrastructure
cycleparking
106760Photo #106760Many of our employees cycle to work. Others want to but there is not sufficient cycle parking provision. New cycle racks would improve the street front and help us reach our ecology goals!Cycle parking:
Problem
cycleparking
106745Photo #106745An O-bike by the racks between King's Cross and St. Pancras stations.Cycle parking:
Infrastructure
cycleparking
106624Photo #106624Contraflow cycle lane interrupted by a give way markingCycleway:
Infrastructure
cycleways
106623Photo #106623Contraflow cycle lane past the Brunswick CentreCycleway:
Infrastructure
cycleways
106622Photo #106622OSM/OCM show Judd St as closed to motor traffic at Euston Road, which is not (usually) the case - anyway it's good that they kept a cycle lane open during roadworks.Roadworks:
Event
roadworks
106619Photo #106619This is a mixed residential and commercial area, with only a single stand. There are many cyclists in the area in need of cycle parkingCycle parking:
Problem
cycleparking
106454Photo #106454Cycle parking at SOAS, University of London.

Often busy; room for over 100 bicycles, although the actual number may vary owing to changes in the number of stands and street furniture every so often.

Private land owned by the University of London; public right of way and no restrictions on cycle parking.
Cycle parking:
Infrastructure
cycleparking
106369Photo #106369This will make life simpler! Contactless bike-sharing in London.Bike share:
Good practice
bikeshare
106265Photo #106265Large and well stocked Santander bike stationBike share:
Infrastructure
bikeshare
106264Photo #106264Cycle lane to nowhere - is it for people returning Santander bikes, or dismounting to reach Euston station?Cycleway:
Infrastructure
cycleways
106263Photo #106263New double-deck cycle parking and Sheffield stands at the new taxi rank, Euston station.Cycle parking:
Infrastructure
cycleparking
106262Photo #106262New double-deck cycle parking and Sheffield stands at the new taxi rank, Euston station.Cycle parking:
Infrastructure
cycleparking
106252Photo #106252New closure to motor vehicles in BloomsburyCycleway:
Infrastructure
cycleways
105968Photo #105968This is a quiet residential street with plenty of parking space, so could easily do with a bike hangar or other bike parking options without being disruptive to neighboursCycle parking:
Problem
cycleparking
105894Photo #105894Not all loading is essential*. Clerkenwell Rd needs kerb-protected bike tracks. Paint doesn’t work.

*(London officially has the tastiest tap water in the world). t.co/xChTttRZEA
Car storage:
Problem
carstorage

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://camden.cyclestreets.net/photos/all/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.