Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: An example of good practice |
Tags: | None |
Date time: | 12.42pm, Saturday 11th February, 2012 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Camden |
Minimal infrastructure required for this cycle contraflow.
Comments reflect the views of the original submitter only.